Bureau supported the Changhua Offshore Wind Farm development with the provision of inspectors which assisted in the successful completion of the manufacturing of 84 pin piles off the coast of Taiwan. Each pin pile manufactured has a diameter of 3m, a maximum length of 82m, and maximum weight of 310 tonnes.

The project entails the manufacturing and installation of 21 5.2MW offshore wind turbines, works also include the manufacturing and installation of all equipment as well as operation and maintenance for a period of five years.

To discuss your inspection project, get in touch.